GPU SERVER SOURCE GPU SYSTEM SITE READINESS CHECKLIST Use the current installation documents for the exact OEM configuration. Complete this with the facility and installation providers. EQUIPMENT OEM model and system quantity: Installed configuration / rack scope: Manufacturer installation document and revision: Packaged dimensions and handling requirements: System or rack dimensions and operating weight: RECEIVING AND ACCESS Delivery window and receiving contact: Loading area and unloading responsibility: Door, lift and route clearances: Handling equipment and personnel: Floor loading approval: Rack space, rails and mounting compatibility: Service clearances: Packaging and discrepancy reporting process: POWER AND COOLING Approved facility capacity and feeds: PDU, connectors and electrical distribution: Redundancy and circuit plan: Airflow and heat-removal requirements: Liquid-cooling equipment and supplier: CDU included in offer or supplied by facility: Coolant conditions and connection requirements: Installation and inspection responsibilities: NETWORK AND HANDOVER Compute fabric, adapters, switches and topology: Optics / cables / port counts: Storage and management network: Customer-supplied items: Firmware / software configuration record: Acceptance tests and responsible parties: Support and escalation ownership: Open actions before deployment: This is a planning template, not an engineering installation specification. Downloading or completing it does not submit an inquiry.