ENTERPRISE AI INFRASTRUCTURE

Configuration and Project Services

Define the complete scope before requesting a quotation. Hardware, deployment requirements and ongoing coverage should be evaluated together.

System Configuration

A complete equipment list connects the server platform to the workload. Include the options that affect compatibility, operating cost and deployment readiness.

AreaInclude in the request
ComputeGPU model/count, CPU requirements and installed system memory.
StorageBoot/data capacity, enterprise SSD type, endurance and redundancy.
NetworkingEthernet or InfiniBand, link speeds, adapters, switches, optics and cables.
Rack equipmentRack dimensions, rails, power distribution, management and cabling.
CoolingAir or liquid cooling, facility connections and operating requirements.
SoftwareOperating system, drivers, frameworks and required licenses.

Deployment Scope

Factory and Rack Preparation

Specify component installation, firmware settings, rack assembly, cabling and configuration records. Identify which items must arrive ready for installation.

Site Installation

Include receiving, positioning, facility connections, network setup and commissioning where required. The proposal should name the responsible party and deliverables for each activity.

Service availability and responsibility are established in the project proposal. OEM-required liquid-cooling and onsite integration must be included where the selected platform requires them.

Acceptance and Handover

Agree the test conditions before ordering. A defined handover can include a component inventory, firmware and driver versions, GPU visibility, storage checks and a representative workload test.

  • Installed equipment and serial-number record.
  • System configuration and management access handover.
  • Agreed health checks and test results.
  • Support ownership, escalation route and remaining actions.

Include Services in the RFQ

List the configuration, installation and acceptance work needed at your site.