HPE / CONFIGURED GPU SERVER
ProLiant DL380a Gen12 · 8× RTX PRO
DL380a Gen12 · P76706-B21 CTO-based build
Eight professional Blackwell GPUs in an HPE air-cooled enterprise platform.
2 × Intel Xeon 6745P
- GPU configuration
- 8 × RTX PRO 6000 Blackwell
- System memory
- 2 TB · Build target
- Cooling
- Air
- Form factor
- 4U
System Configuration
Eight professional Blackwell GPUs in an HPE air-cooled enterprise platform. This catalog configuration is quoted as a complete populated system. Server Edition configuration requires the compatible CTO chassis, front fan/panel kits and eight power supplies.
- GPU platform
- 8 × NVIDIA RTX PRO 6000 Blackwell, 96 GB per GPU
- CPU
- 2 × Intel Xeon 6745P
- System memory configuration
- 2 TB proposed build target; final modules confirmed in the quote
- Form factor
- 4U rackmount
- Cooling
- Air cooled; OEM fan and GPU enablement requirements apply
- Storage
- Installed enterprise boot and data SSDs selected in the quotation
- Networking
- Installed network interfaces and external fabric defined in the quotation
- Configuration requirements
- Server Edition configuration requires the compatible CTO chassis, front fan/panel kits and eight power supplies.
Quotation Scope
A complete system is built to the quoted equipment list; GPU count and any memory target shown are selected configurations. CPU, installed RAM, enterprise boot/data SSDs, network adapters, power supplies and required OEM GPU components are included in the final bill of materials.
Include the required quantity, equipment condition, configuration changes, software environment and target delivery date. The quotation identifies included components and customer-supplied items.
Review the purchasing processDelivery and Support
Deployment Requirements
Confirm rack space, receiving access, electrical capacity, airflow and network connections before scheduling the deployment.
Delivery and site preparationCoverage in the Offer
Specify warranty provider, duration, service location and any required response commitment. Hardware, software and facility responsibilities should be identified separately.
Warranty and lifecycle planning