SUPERMICRO / CONFIGURED GPU SERVER
Instinct MI300X · Liquid
AS-4125GS-TNMR2-LCC · Integrated liquid build
A liquid-cooled MI300X node for integrated AMD accelerator racks.
Dual AMD EPYC 9004 / 9005
- GPU configuration
- 8 × MI300X
- System memory
- Configured
- Cooling
- Liquid
- Form factor
- 4U
System Configuration
A liquid-cooled MI300X node for integrated AMD accelerator racks. This catalog configuration is quoted as a complete populated system. EPYC 9005 support requires motherboard revision 2.x; onsite liquid-cooling service required.
- GPU platform
- 8 × AMD Instinct MI300X
- CPU
- Dual AMD EPYC 9004 / 9005
- System memory configuration
- Installed capacity specified in the quotation
- Form factor
- 4U rackmount
- Cooling
- Direct liquid cooling; facility and integration scope required
- Storage
- Installed enterprise boot and data SSDs selected in the quotation
- Networking
- Installed network interfaces and external fabric defined in the quotation
- Configuration requirements
- EPYC 9005 support requires motherboard revision 2.x; onsite liquid-cooling service required.
Quotation Scope
A complete system is built to the quoted equipment list; GPU count and any memory target shown are selected configurations. CPU, installed RAM, enterprise boot/data SSDs, network adapters, power supplies and required OEM GPU components are included in the final bill of materials. Liquid-cooled rack integration and onsite service are required; rack infrastructure is scoped in the project quotation.
Include the required quantity, equipment condition, configuration changes, software environment and target delivery date. The quotation identifies included components and customer-supplied items.
Review the purchasing processDelivery and Support
Deployment Requirements
Confirm facility electrical capacity, rack access, coolant interfaces, CDU scope and installation ownership for the exact offered configuration.
Delivery and site preparationCoverage in the Offer
Specify warranty provider, duration, service location and any required response commitment. Hardware, software and facility responsibilities should be identified separately.
Warranty and lifecycle planning